Construction of a material discharge pipe at the Port Authority Of Douala
Project Details
Info.
Client: Port Authority of Douala
Duration: 45 days
Description.
Construction, Assembly and Installation of the dredged sediments discharge pipe of the Duc d'Albe.
Point 1
The elbows, breather pipes, massifs and the assembly of the pressure pipe were carried out by our workers and our experts for a result beyond the expectations of our customers.