Dredging of CIMENCAM berths 51 & 52 at the Port Authorithy of Douala
Project Details
Info.
- Client: CIMENCAM
- Location: Port Authority of Douala
Description.
Thanks to mechanical dredging, we excavate consolidated materials and alluvial sediments using a "toad" type bucket attached to a crane, a hydraulic jackhammer mounted on an excavator placed on a work barge.
Point 1
Use of a "toad"type bucket hooked to a crane, a hydraulic jackhammer mounted on an excavator placed on a work barge.
Point 2
The materials are then transported to a landfill by dump trucks.